Home » Portfolio » Red Hawk Wastewater Treatment Plant
Red Hawk Wastewater Treatment Plant
         
Red Hawk Aerial
Red Hawk pumps inside
Recycled water pipeline
Red Hawk pumps outside
Red Hawk grass

 

 

Client
Shingle Springs Band of Miwok Indians

Project Location
El Dorado County, California, USA

Summary of Services
Planning, Design, Construction Administration and Inspection

Project Scope
HSe designed water and wastewater facilities for the Red Hawk Casino. The design included a 250,000 gpd immersed membrane bioreactor (MBR) facility to produce effluent that meets Title 22 standards, allowing treated wastewater to be reused at the casino for toilet flushing, landscape irrigation, and other non-potable uses.

Project components include a headworks with odor control facilities, an overflow basin, a pump station, a chlorine generation system, chlorine contact tank, and an operations building. HSe also designed the effluent disposal system consisting of 13 acres of leach fields and 5 acres of spray fields that are distributed around the Rancheria.

Next Project »

 

 

To learn more about HSe and our affiliated companies, or to receive a Statement of Qualifications, please contact us.

Email information@hydroscience.com

 

 

HSe Home | HydroScience Group of Companies Home

© 2006-2010 HydroScience Engineers, Inc. All rights reserved.